CompletedWater TreatmentKarachi Waste Water Treatment Plant 4

M/s Indus Associated Consultants in joint venture with other consultancy firms was awarded the subject project by the Government of Sindh / Asian Development Bank for feasibility study and detailed design of the subject project.

ADB assisted – TA-9292 REG: Strengthening Project preparation capacity in Asia and the Pacific – Supporting preparation of Infrastructure Projects with Private Sector participation in Asia Pacific (subproject 4) – #1 PAK: Wastewater Technical Firm (Karachi Waste Water Treatment Plant 4) (949407-005)

M/s Indus Associated Consultants in joint venture with other consultancy firms was awarded the subject project by the Government of Sindh / Asian Development Bank for feasibility study and detailed design of the subject project.

Scope of Work

Following is the scope of work for the subject assignment:

  1. Feasibility Study
  2. Detailed Design

Detailed Technical design, Topographic Surveys, design reports, inception reports, drawings, cost estimates & Tender Documents. Waste water quality was checked. The detail design covered all relevant parameters with drawings, followed by preparation of PC-I / cost estimate covering technical and financial viability.

The Salient Features of the project are as under:

Client: Government of Sindh, (ADB Funded)
Consultancy Cost: USD 184,000
Commencement Date: January, 2021
Completion Date: April, 2021
Status: Completed