CompletedTransportation/HighwayMardan Swabi Bypass Road Project (18 Km Approx.)

A joint venture with local consultancy firm was awarded the subject project by PKHA through an open bidding process for Feasibility Study, Detailed Design and Construction Supervision of Mardan Swabi Bypass Road Project (18 Km Approx.) including 2 Nos. Bridges.

Feasibility Study, Detailed Design and Construction Supervision of Mardan Swabi Bypass Road Project (18 Km Approx.) including 2 Nos. Bridges

M/s Indus Associated Consultants (Pvt.) Ltd. in joint venture with local consultancy firm was awarded the subject project by PKHA through an open bidding process for Feasibility Study, Detailed Design and Construction Supervision of Mardan Swabi Bypass Road Project (18 Km Approx.) including 2 Nos. Bridges.

The main objective of this project was to assist the Government of Khyber Pakhtunkhwa through Frontier Highway Authority (FHA) now Pakhtunkhwa Highway Authority (PKHA) in carrying out the detailed design and Construction Supervision of Mardan Swabi bypass road project.

Scope of Work

Following was the scope of work for the subject assignment:

  1. Feasibility Study
  2. Detailed Design
  3. Construction Supervision
  4. Quality Control of road Works Construction Works

The Salient Features of the project are as under:

Client: PKHA
Project Length: 17.350 KM
Consultancy Cost: Rs. 9.54 million
Commencement Date: March, 2009
Completion Date: July, 2012